The Work Location: Richmond, VA
The Opportunity
The 5th floor of the hospital was being renovated, and two 25-30 year old air handlers were in need of replacement.
The Solution
Installed temporary cooling to keep floor conditioned as they continue to work on patients. Installing new HVAC equipment, associated controls, and ductwork.
Results
This new equipment is providing the hospital with reliable heating and cooling.